|
STUDIES & ANALYSIS
Economic Development
Southern California Association of Governments
- DRI/McGraw Hill
Alameda Corridor Economic Study
TSG prepared an inventory of economic data and businesses within
the Southern California study area. TSG facilitated a series of
meetings with cluster groups of businesses, policy makers, utilities,
government officials, and others to help businesses in the region
identify solutions to keep the region successful.
County of Los Angeles Community Development
Commission
SELAC Defense Adjustment Study
TSG assisted cities coping with the downsizing of the aerospace
industry and its accompanying effect on tax revenues, land use,
employment, and economic revitalization. TSG identified training
programs. In addition, focus groups were held with businesses to
ascertain what the County could do to fashion a strategy for aerospace
conversion.
Housing Authority of the City of Los Angeles
Small Business Feasibility Study of Public Housing Residents
TSG assessed the feasibility of various small business ventures
and the capacity of residents at the Mar Vista Gardens and Dana
Strand Housing Projects to pursue the recommended ventures. The
evaluation included gathering secondary market data and conducting
surveys to gather primary market data. Additionally TSG researched
data on the various small business opportunities that exist within
the community such as franchises and cooperatives.
Metropolitan Water District (MWD), Los
Angeles, CA
Strategic Planning
TSG is part of a team that assisted the MWD Board of Directors,
staff, and its member agencies in preparing a strategic plan to
guide MWD into the 21st Century. This process has been developed
to address the rapid change in the water industry and to help MWD
stay in the forefront of the water industry. TSG assisted the consultant
team in performing stakeholder interviews to evaluate MWDs
current operating environment, and utilized this information to
develop new business model options for MWD. An important component
of this process included holding of public workshops to inform the
public of the MWD strategic planning process and to garner feedback
related to the process. TSG was responsible for the development
and coordination of the public workshops that took place in the
Los Angeles and San Diego areas.
Central Basin Water District, CA
Strategic Planning
TSG was a part of the consultant team selected by the Central Basin
Municipal Water District to assist the District in positioning itself
to react to changes in the water environment and to better meet
the needs of its constituents the water purveyors and the
water consumers. The District Board Members and staff, along with
other stakeholders participated in the process. TSG participated
in stakeholder interviews, which included personnel from the Public
Affairs/Relations department at the District and coordinated related
public workshops to gain garner feedback from the public.
>Back to Top
Impact Assessments
Central Basin Water District, CA
Infrastructure Project Study
TSG assisted the Central Basin Water District to study and determine
the most feasible location for the Districts planned infrastructure
project. The $10 million infrastructure project will ultimately
provide access to reclaimed water by the Southeast Los Angeles cities.
TSG determined that cities with large concentrations of industrial
users would be especially hard hit during periods of drought because
the MWD has instituted huge surcharges for excessive water usage
during periods of water shortages. Without other sources of water,
these businesses might have to shut down portions of their operations.
Metropolitan Water District, Los Angeles,
CA
Salinity Management Study
TSG provided technical support to develop a long-term salinity
management strategy. Data was collected and assessed to formulate
alternative strategies in response to the problems caused by high
salinity concentrations. Salinity issues have arisen due to an increase
in recycled water usage, groundwater management, waste discharge
permits, industrial uses, irrigation, domestic use, and higher drinking
water standards. TSG facilitated a series of meetings with member
agencies and others to gather input for the study.
Central Basin Water District, CA
Water Utility Relocation Engineering
TSG assessed the impact on retail water utilities affected by the
construction of the Mid Section of the Alameda Corridor Project.
Specifically, TSG verified impacts on retail water facilities along
the Alameda Corridor Mid Section and evaluated each water utility
needs for existing crossing connections, including possible alternatives
or in-lieu facilities. TSG also evaluated the water
requirements during the project construction phase, provided an
assessment of the design standards for in-kind replacement and new
facilities, coordinated design and construction requirements, and
evaluated the post construction responsibilities of all interested
parties, including Central Basin, ACTA, design-build contractor
and the utilities.
Southern Califonia Association of Governments
I-710 Corridor Study
Integrated public input and built consensus among stakeholders
in order to identify mitigation opportunities for corridor improvements
via Informal Value Analysis workshops, development of media and
community relations collateral, development of a telephone hotline,
and conducted community forums that focused on Environmental Justice
issues relative to how the I-710 study addressed unique transportation
challenges facing ethnic, low-income and transit-dependent communities.
Bay Area Rapid Transit (BART), San Francisco,
CA
Parking Studies
TSG conducted parking surveys in the cities of San Bruno, South
San Francisco, and Millbrae to determine parking impacts resulting
from BARTs rail extension in each of the cities.
>Back to Top
|